Many companies cut costs by using cheap base materials like H2 or H3 timber — these are not designed for ground contact and often start to rot after just 2–3 years. Unfortunately, it’s nearly impossible to check this once the deck is finished.
We use only: H4 treated timber (designed for contact with soil or high moisture) or aluminium subframe, for a longer lifespan and zero risk of rot.
If we use timber, we also apply a special waterproof protective tape, extending the base life to 10+ years.
Composite decking is made from a mix of wood fibres and recycled plastics, offering the natural appearance of timber with none of the drawbacks. Unlike traditional wood, composite boards don’t warp, crack, or rot, and they require virtually no ongoing maintenance.
| MATERIAL PRICELIST | |||
|---|---|---|---|
| # | Item | Unit | Price (AUD) |
| M1 | Deck Base – H3 Timber building materials | per m² | 90 |
| M2 | Deck Base – H4 Timber building materials | per m² | 110 |
| M3 | Deck Base – Aluminium | per m² | 140 |
| M4 | Deck base, cladding base fasteners | per m² | 12 |
| M5 | Deck base fasteners stainless steel | per m² | 22 |
| M6 | Joist Sealing Tape | per m² | 5 |
| M7 | Econom Composite Decking | per m² | 55 |
| M8 | Standard Composite Decking | per m² | 150 |
| M9 | Standard Composite Decking (second option) | per m² | 150 |
| M10 | Premium Composite Decking | per m² | 200 |
| M11 | Premium Plus Composite Decking | per m² | 280 |
| M12 | Pine Decking | per m² | 55 |
| M13 | Blackbutt Decking | per m² | 115 |
| M14 | Spotted Gum Decking | per m² | 105 |
| M15 | Merbau Decking 18 mm | per m² | 80 |
| M16 | Merbau Decking 25 mm | per m² | 100 |
| M17 | Deck cover fasteners | per m² | 16 |
| M18 | Deck cover fasteners composite, cladding fasteners | per m² | 5 |
| M19 | Additional steps / structures | per line meter | 250 |
| M20 | Oil for decking materials for 1 coat | per m² | 11 |
| M21 | Sanding Materials | per m² | 5 |
| Labour PRICELIST | |||
|---|---|---|---|
| # | Item | Unit | Price (AUD) |
| L1 | Material Delivery | per project | 350 |
| L2 | Earthworks or concreting of footings for the base | per m² | 100 |
| L3 | Deck Base - installation (H3 or H4) | per m² | 95 |
| L4 | Deck Base - installation (aluminium) | per m² | 115 |
| L5 | Deck covering installation composite | per m² | 130 |
| L6 | Deck installation Merbau/Pine | per m² | 155 |
| L7 | Cladding installation | per m² | 45 |
| L8 | Cladding base installation | per m² | 45 |
| L9 | Base Demolition (up to 1m) | per m² | 20 |
| L10 | Deck Demolition | per m² | 30 |
| L11 | Waste Removal (service or small job) | per project | 90 |
| L12 | Waste Removal (no demolition) | per project | 350 |
| L13 | Waste Removal (deck only) | per project | 550 |
| L14 | Waste Removal (deck & base) | per project | 750 |
| DECK REPAIR & SERVICE | |||
| # | Item | Unit | Price (AUD) |
| L17 | Base repair | per m² | 100 |
| L18 | Partial replacement of deck covering | per m² | 200 |
| L19 | Hard Machine Sanding (if less than 20 meters = 20 meters) | per m² | 80 |
| L20 | Hard Sanding (if less than 20 meters = 20 meters) | per m² | 30 |
| L21 | Light Sanding (less 20 meters = 20 meters) | per m² | 17 |
| L22 | Cleaning deck (High Pressure washing) (if less than 20 meters = 20 meters) | per m² | 5 |
| L23 | Preparation of wooden surfaces for sanding and oiling, using a special chemical agent (removal of old paint, mold and dirt) and washing the surface with high-pressure equipment (if less than 20 meters = 20 meters) | per m² | 12 |
| L24 | Removing old paint from the deck using a special chemical agent (if less than 20 meters = 20 meters) | per m² | 15 |
| L25 | Lightening the deck wood using a special chemical agent (if less than 20 meters = 20 meters) | per m² | 10 |
| L26 | Oiling 1 coat (if less than 20 meters = 20 meters) | per m² | 12 |
| L27 | Countersinking all screws and punching down all nails below the deck surface as part of preparation for sanding and finishing. (if less than 20 meters = 20 meters) | per m² | 10 |
Leave your details and we’ll contact you to schedule a free site visit. We’ll help you choose the right materials, layout, and finish — no pressure, just friendly advice.
We hold a valid NSW carpentry license, guaranteeing that all our decking and woodwork meets the strict Australian building standards.
License No: [500077C].
We are fully insured to protect your home :